Steel Erectors: How to Pick the Right MEWP or Telehandler

Jun 02, 2026

At A Glance:

Access Equipment Considerations
  • Load Capacity and Platform Size
  • Height and Reach
  • Stability and Safety
  • Ease of Access and Movement
  • Fuel Type and Power Source
  • Operational Speed and Efficiency
Share

Craft professionals like steel erectors and ironworkers are highly focused on selecting access equipment that supports safety, productivity and operational efficiency on the job site. The choice of a MEWP (mobile elevating work platform) or telehandler can vary depending on the specific type of work, site conditions and project requirements.

However, the fundamental goal is always to make sure the lifting equipment supports safe and efficient steel erection, whether on a high-rise building, industrial structure or other construction projects. Here are the primary considerations:

1. Load Capacity & Reach

  • Ensure the MEWP or telehandler can support the weight of workers, tools, and materials
  • Consider the maximum working height and horizontal outreach required for the job

 

2. Terrain & Ground Conditions

  • Assess whether the site has rough terrain, slopes or uneven ground
  • Choose a machine with four-wheel drive or stabilizers if necessary

 

3. Accessibility & Maneuverability

  • Consider space constraints on-site (e.g., narrow access points or congested areas)
  • Articulated booms or compact telehandlers may be needed for tight spaces

 

4. Power Source & Emissions

  • Indoor work: Choose electric-powered models to reduce emissions
  • Outdoor work: Diesel-powered machines may be better for longer run times

 

5. Safety Features

  • Check for fall protection anchors, overload alarms and tilt sensors
  • Ensure compliance with working at height regulations

 

6. Operator Training & Familiarity

  • Ensure workers are trained and qualified to operate the selected equipment
  • Some operators may require familiarization on new machine models for safe use

 

Ultimately, the correct selection of an MEWP or telehandler for steel erection work is a critical decision that directly impacts the safety, efficiency and success of any project. By carefully evaluating factors such as load capacity, terrain, accessibility and safety features, choosing the right lift for the work to be done makes sure ironworkers can operate safely and effectively, meeting the particular demands of the job whether working on high-rise structures or industrial sites.

JLG® Solutions for the Steel Erection Market

Ironworkers need reliable, maneuverable equipment that can lift them and their materials to height on demanding job sites like steel buildings, bridges and other structures. JLG delivers innovative solutions that enhance performance, reliability and consistency for the steel erection market.

Generic-JLG-Author-small
Rich Mullins
Strategic Account Manager

Get industry insights from #DirectAccess to your inbox.