 |
| |
|
|
|
|
|
Inspections
Annual: Let JLG perform your required annual inspections. These inspections can be conducted at our facility or at your location, and they include complete documentation with the machine stamp and acceptance to perform any work as identified from the inspection.
Two Year Boom Inspection: Inspections are required every two years on chain extension and retraction models. The process includes removal of mid- and fly-boom sections, reassembly with new parts as necessary or requested, load management set up and testing (110-foot and 120-foot models). The process also includes the installation of a new boom chain, wear pads, chain plate, top plate, eye bolts, sheaves, and clevis pins. Call JLG today for pricing or to schedule your inspections.
Seven Year Cable Replacement: Inspections are required every seven years on cable extension and retraction models. The process includes removal of mid- and fly-boom sections, reassembly with new parts as necessary or requested, and the installation of new boom cables, wear pads, sheaves, and shims. Call JLG today for pricing or to schedule your inspections.
Use the JLG Boom Inspection Form, JLG Scissor Inspection Form, or the JLG Vertical Lift Inspection Form.
|
 |
|
 |
|
|
|
|
|
 |